Complete Triton II Sand Filter Parts Breakdown with Exploded View Diagram

triton ii sand filter parts diagram

Begin by locating the multiport valve–typically positioned at the top of the vertical tank. This control hub features seven positions: Filter, Backwash, Rinse, Waste, Recirculate, Closed, and Winter. Verify the valve’s O-ring seal before operation to prevent leaks; replace every 6–12 months or if elasticity is compromised. Always rotate the handle clockwise to avoid damaging internal gears–abrupt turns can misalign the diverter plate.

Inside the chamber, the standpipe assembly acts as the central conduit. Secure it to the base with the locking ring–use a torque wrench set to 15–20 ft-lbs to avoid overtightening. The laterals at the bottom (commonly six or eight) should be inspected for cracks; brittle plastic indicates UV degradation. Replace fractured sections immediately–clogged laterals reduce flow by up to 40%, straining the system and increasing backwash frequency.

For maintenance, detach the tank’s dome using a strap wrench–standard pipe wrenches risk cracking the fiberglass. Rinse the interior with a low-pressure hose (under 50 PSI) to dislodge debris; high pressure can damage the laterals. When reassembling, apply silicone lubricant to the dome gasket–this prevents binding during removal for future servicing. Check the pressure gauge weekly; a rise above 8–10 PSI from baseline signals dirty media, necessitating backwash or replacement.

Electrical components include the timer clock and actuator motor. Ensure the clock is set to Backwash mode for 3–5 minutes, followed by Rinse for 30–60 seconds to clear particulates. The actuator requires 24V AC–verify wiring connections with a multimeter; corrosion at terminals reduces voltage delivery. For troubleshooting, a hiss or hum during operation indicates trapped air–bleed the lines via the air relief valve before restarting.

Hayward Series II Media Chamber Component Breakdown

triton ii sand filter parts diagram

Begin disassembly by locating the multi-port valve on the upper hemisphere–its six-position switch controls flow direction. Before removing the valve assembly, relieve internal pressure by turning the pump off and opening the air bleed valve on top of the tank. Failure to vent trapped air risks sudden gasket displacement during disassembly, potentially damaging O-rings or cracking the base housing.

The main tank consists of three critical sections:

  • Base plate: Houses the laterals (plastic grid tubes) that distribute water evenly across the granular bed. Inspect lateral arms for splits or missing end caps–even minor damage creates “dead zones” where debris bypasses cleansing.
  • Mid-section cylinder: Standard 20″ diameter units hold ~250 lbs of #20 silica, calibrated at 0.45–0.55 mm grain size. Grain coarser than 0.6 mm reduces surface area by 38%, undermining filtration efficiency by allowing micron-size particulates through.
  • Upper dome: Contains the standpipe, which must align precisely with the valve’s central port. Misalignment by ≥2 mm causes short-circuiting where unfiltered feed bypasses the media bed entirely.

Key consumables require biannual inspection:

  1. Replace phenolic resin-infused laterals every 4–5 years–UV degradation makes them brittle.
  2. Swap the rubber flange gasket if compression set exceeds 20%; measure gasket height with calipers before reassembly.
  3. Inspect the tank’s polyethylene body for osmotic blistering–common near chlorine injection points where molecular breakdown accelerates wall thinning.
  4. Verify backwash flow rate matches manufacturer specs (typically 15–20 GPM per ft²), using a calibrated flow meter.

When reassembling the valve, apply 100% silicone lubricant (not petroleum-based) to the spider gasket. Torque the six clamp bolts in a cross pattern at 12–15 ft-lbs–over-tightening distorts the flange, causing seal failure. The standpipe height must terminate 1/8″ below the valve’s internal weir; any deviation alters the water-air interface critical for proper backwash initiation.

Troubleshooting Flow Anomalies

triton ii sand filter parts diagram

  • Low circulation: Check for clogged laterals first. Backflush at 25 GPM for 3 minutes–if flow doesn’t normalize, dissemble and rinse each lateral individually with a 45 psi nozzle.
  • Channeling: Look for disproportionate wear on one side of the particle bed. Realign standpipe vertically within 0.5° of tank centerline and verify bed depth uniformity (±2″ tolerance).
  • Pressure differential drop: Measure inlet/outlet pressure weekly. Normal ΔP is 8–10 psi; drops below 6 psi indicate channeling or media exhaustion requiring replacement.

Identifying Core Elements in Your Pool Purification System Assembly

triton ii sand filter parts diagram

Start by locating the multiport valve at the top of the housing–this is the primary control hub. Verify its six settings: Filter, Backwash, Rinse, Waste, Recirculate, and Closed. Misalignment here disrupts water flow and reduces efficiency; always confirm the handle clicks into each position.

Examine the pressure gauge, typically mounted on the valve’s side. Normal operating range is 10–20 psi; a spike above 25 psi signals trapped debris in the bed, demanding a cleaning cycle. Ignoring this leads to cracked laterals or burst seals.

The internal distribution system includes a standpipe and laterals–fragile yet critical for uniform flow. Check for cracks by disassembling the unit; replace any damaged laterals immediately. A single broken lateral causes untreated water to bypass the bed entirely.

Visual Breakdown of Critical Components

triton ii sand filter parts diagram

Component Material Lifespan Failure Signs Maintenance Action
Multiport valve Engineered polymer 5–7 years Sticky handle, leaks Lubricate O-rings, replace gaskets
Pressure gauge Stainless steel/acrylic 3–5 years Inaccurate readings Calibrate or replace
Standpipe/laterals PVC 7–10 years Visible cracks, sand in pool Replace damaged sections
Tank body Fiberglass-reinforced resin 10+ years Weeping seams, bulges Patch minor flaws; full replacement if structural

Inspect the tank’s interior surface for pitting or blisters. These defects often go unnoticed but create weak points that worsen under pressure. Use a bright LED flashlight during inspections–LED light reveals flaws invisible under standard bulbs.

Don’t overlook the bed media; its grading directly impacts performance. Standard granulation is 0.45–0.55mm; finer particles cause clogging, coarser ones allow bypass. Test a sample by soaking it in water–if it clouds within 30 seconds, contamination is present. Replace media every 3–5 years regardless of visible condition, as microscopic wear compromises filtration.

Troubleshooting Common Assembly Issues

Uneven water distribution? Check the lateral slots for obstructions–sand grains or calcium deposits often block them. Soak laterals in a 50/50 muriatic acid solution for 10 minutes to dissolve buildup. Low flow rate despite clean laterals? Verify pump impeller clearance; a misaligned impeller reduces suction by up to 40%.

Step-by-Step Breakdown of the Triton II Filter Lid and Multiport Valve

Begin by placing the upper housing on a stable, flat surface to prevent damage to the seal or threads. Align the rotary selector with the “Backwash” position before disassembly to relieve internal pressure–failure to do so risks water spray and component misalignment.

The cover assembly secures with six 1/4-inch stainless steel bolts; remove them in a star pattern to distribute stress evenly. If bolts resist, apply penetrating oil and wait 10 minutes–avoid excessive force, as stripped threads require costly replacements. Inspect the O-ring immediately; replace if cracked or flattened, as even minor imperfections compromise sealing efficiency.

Detach the valve body by lifting it straight upward to prevent binding on the center spindle. The spindle, made of corrosion-resistant polymer, may accumulate debris–clean it with a soft brush and silicone-based lubricant (petroleum-based products degrade seals over time). Check the diverter plate inside the lower chamber; misalignment here causes incomplete backwash cycles, reducing system performance by up to 30%.

Examine the spring-loaded diaphragm beneath the selector; it regulates flow between filter modes. If the diaphragm tears, replace the entire control module–attempting repairs voids warranty and risks catastrophic failure. Note the orientation of the rubber gasket inside the lid; flipping it prevents proper seating, leading to leaks during operation.

Reassembly Sequence

triton ii sand filter parts diagram

Apply a thin layer of food-grade grease to the O-ring before reinstalling the cover–this prevents dry sealing and extends service life. Torque bolts incrementally, alternating diagonally in three passes: 10 ft-lbs, 20 ft-lbs, and final 30 ft-lbs. Overtightening warps the lid, while under-tightening allows water bypass during high-pressure cycles.

The multiport mechanism requires precise calibration after reassembly. Test each setting (Filter, Backwash, Rinse, Waste) with the pump running to confirm smooth transitions. If resistance occurs, disassemble immediately–the internal cam may have shifted, and continued use will damage the spindle or selector.

Maintenance Checklist

Schedule quarterly inspections for the selector’s position indicator; wear here misleads users into incorrect valve operation. Replace the entire housing if spider cracks appear near bolt holes–these expand rapidly under cyclic pressure. Keep spare parts on hand: a repair kit should include an O-ring, diaphragm, and two spare bolts (M6 x 1.0 thread pitch).

Proudly powered by WordPress | Theme: Amber Blog by Crimson Themes.

Complete Triton II Sand Filter Parts Breakdown with Exploded View Diagram

Complete Triton II Sand Filter Parts Breakdown with Exploded View Diagram